High supply temperatures can leave district heating operators losing heat in distribution while making lower-temperature sources harder to use. A real-time digital twin connects a model to updated information from the physical network, allowing operators to assess a temperature change or waste-heat connection before changing operation. The Kassø–Aabenraa case shows the value of that assessment—and why a simulated saving is not yet an operating result.

From network data to a digital twin

A digital twin is a model of a physical asset or environment that uses information from its counterpart to examine behaviour over time. The digital-twin overview describes both simulation and the use of performance information to anticipate future behaviour. For an operator, the distinction is between a model left with its original assumptions and one updated as conditions change.

Data integration is part of that work, but it is not the whole model. Microsoft documents a route for bringing device telemetry into Azure Digital Twins and a separate mechanism for twin-to-twin events. Neither mechanism, on its own, calculates how a heating network responds to a proposed supply temperature. That decision also needs a model of network behaviour and checks against observations.

The same distinction helps when comparing digital twin platform options. Eclipse Ditto is described as a digital-twin framework; that description does not make it a district heating simulation model. MindSpore identifies itself as an open-source deep-learning framework, rather than a digital twin platform. A free framework may address one integration task without providing the modelling needed for the operating decision.

Why supply temperature changes the operating decision

A lower supply temperature is attractive only if the network can still meet demand. Keeping temperatures high has a cost: Gradyent identifies heat loss as a disadvantage and says high forward temperatures weaken the business case for heat pumps and geothermal sources. It also says heat pumps and solar thermal sources operate more efficiently at lower temperature levels.

That makes supply temperature a network-wide decision, not a setting to reduce on the strength of a general estimate. Gradyent gives around 15% as a typical operating heat-loss estimate for high-temperature systems and suggests that a small temperature reduction could cut heat-pump operating costs by more than 20%. Neither figure is a measured saving for the network in front of you. A district heating digital twin is useful here because operators can assess a proposed temperature against modelled supply and demand conditions before accepting the operational risk.

Assessing waste heat in a connected district heating system

A proposed waste-heat source adds another question: when the heat is available, how should it fit with demand and the rest of the supply system? A published study examined waste heat from a new Power-to-X plant in Kassø, southern Jutland, for Aabenraa’s district heating network.

The researchers combined model-based and data-driven techniques and used multi-agent-based simulation to assess integration. Their simulations informed how heat supply could be balanced with demand and how the connection might be operated. That is a useful role for scenario simulation: it lets an operator compare proposed strategies before treating a new heat source as dependable supply.

For a municipal water utility, the transferable lesson is the decision method, not the heating outcome. A data-connected model can help frame a proposed operational or investment change, but the Kassø–Aabenraa findings do not predict pressure, leakage or savings in a water distribution system.

What the simulation findings do and do not establish

The Kassø–Aabenraa study indicates reductions in natural-gas consumption and operating costs in its simulation assessment. Those are modelled benefits, not measured savings from an operating waste-heat integration.

Receiving live data would not change that distinction by itself. Telemetry can keep a model informed about physical conditions; measured performance requires comparing its predictions with what subsequently happens in operation. Until then, a simulated reduction supports a decision to investigate or plan a change, rather than a claim that the change has delivered savings.

A connected model supports decisions; operation confirms results

A data-connected digital twin can help district heating operators assess lower supply temperatures and waste-heat integration before changing the network. The simulated gas and cost reductions become operating results only when the physical integration is running and its performance has been measured.